Integral Engineering Design work at Eden Project, Cornwall

With the waste materials from the Eden Project a shelter was built. The Building Plot project design was allowed to naturally evolve over a period of days with no fixed start plan. Integral were able to talk through the loads that would affect the structure of the building with wind uplift being the dominant load. The final design reflects this with careful detailing around the heavy feet of the shelter.

More photos of the event can be found click here!

14/09/10

Back to news

Integral at shelter build, Eden Project!