Skip to main content
Client:NHS Blood and Transplant
Architect:IBI and eXmoor Pharma
Contractor:Kier Construction
Construction value:£2.5m
Embodied carbon A1 – A5:
(structural)
287 kgCO2e/m²

Laboratory Extension NHS Blood and Transplant

Bristol

State of the art Blood and Transplant Laboratory extension for the NHS Trust providing high tech clean rooms, specialist store rooms and offices. Connecting into and expanding on the successful NHSBT Labs in Filton, Bristol, this building integrates heavy servicing with walk on ceilings allowing access to plant. Detailed analysis of the composite concrete slab and steel frame ensured minimal vibration to very sensitive laboratory equipment.

“Integral Engineering Design have provided an excellent service on the NHSBT CBC extension. The team provided a good design solution, proactively collaborating with Kier and the wider design team. They have been quick to respond to questions and when reviewing our design suggestions. Integral are easy to work with and I have enjoyed having them as part of the team.”

Tom Hall, Senior Design Manager, Kier Construction