A new primary school for Bath

A new primary school for Bath

A new primary school for Bath 23 January 2017 Integral are pleased to see the topping out of the new school at Ensleigh which has been given its new name of Abbot Alphege Primary School. The build is well under way and we are working with Rydon Construction to deliver...
Why I came back…

Why I came back…

Why I came back… 19 January 2017 We have welcomed back Giles Mortimer to Integral, now based in the London office. As a graduate, Giles joined the Bath office in 2010. In 2013 he decided to embark on a MSc at Imperial College London. We are now very happy that he has...
Timber Revolution – a comment

Timber Revolution – a comment

Timber revolution – a comment 9 January 2017 A recent BBC’s video article shows that engineered timber products, be that glulam beams or panels in the form of cross lamented timber, allow the adoption of timber on more and more projects. Recognising that timber...